SPRINGER PIT TAILINGS TRANSFER

Client:  Mount Polley Mining Corporation

Dredge and transfer of 3.6 million cubic meters of Copper tailings through an 8-kilometer-long 20” pipeline, using two (2) 14” cutter-head dredges and two 1300 HP booster pumps, with a TDH of 110 meters at Mt. Polley Mine. The project is critical for future productivity of the mine.